Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /var/www/vhosts/barchemicals.it/wordpress/wp-includes/functions.php on line 3837
Risk assessment • Barchemicals

Risk assessment

Drafting Plans Risk, concerning the preparation of sanitary control programs in accordance with current regulations (Pools, Lines Legionellosis Guide, etc.)

Site survey, rating the structural and managerial aspects, reporting critical
Processing Plan and the Protocol sampling and identification of sampling points
Analysis: Chemical, physical and bacteriological; Analysis for Legionella pneumophila
Evaluation results: feedback and advice on corrective actions; support to the drafting of Self-control registry Plans

logo-barchemicalslogo-engineering logo-biopharmalogo-alpha-aqua